110/10 kV Substation "Lubny-Kompressorna"
In 2021, General Energy supplied high-voltage equipment for the 110/10 kV Lubny-Kompresorna substation. The supply was carried out for the contractor MBK Synergy LLC, which performed construction and installation works under a contract with Poltavaoblenergo JSC as part of the company's investment program for 2021.
The project involved the technical re-equipment of the 110 kV open switchgear (OSG) of the substation, which is an important node in the region's power supply system. One of the key stages of the modernization was the installation of a new 110 kV GL312 F1/4031 P gas-insulated switch manufactured by GE.
Replacing the old switching equipment with a modern gas-insulated switchgear has improved the reliability and safety of the power grid, reduced operating costs, and decreased the risk of emergency shutdowns. The implemented solution complies with international standards and ensures stable operation of the substation even under high loads.
The implementation of this project was General Energy's contribution to the development and modernization of the energy infrastructure of the Poltava region, increasing its stability and readiness for the growing needs of consumers.
220/110/35 kV Substation "Boryslav"
In 2021–2022, General Energy supplied modern high-voltage equipment for a 35 kV open switchgear (OS), as well as relay...
View project
330 kV Substation "Kovel"
The reconstruction of the 330 kV Kovel substation was an important step in modernizing the region's energy infrastructure. In...
View project
35/10 kV Substation "Uzhhorod-7"
2021 marked the modernization of the Uzhgorod-7 substation. As part of this project, General Energy supplied 35 kV OVB-VBF series...